← Toutes les offres
AE

Lead Planner

Air Employment Services Sweden Filial

Emploi à Boden : les 271 offres ouvertes, qui recrute, salaires
Boden
CDD
Bygg och anläggning
Expérience
12 ans minimum
Publié le 27 novembre 2026 · Valable jusqu'au 26 janvier 2027

No time to apply? Tired of job hunting?

No problem: JobSpeeder applies for you.

JobSpeeder, a job search assistant, spots new “Lead Planner” openings around Boden every day and sends your application for you, with your CV. Evenings, weekends, the days you've run out of energy: it keeps going.

  • You choose the job, country, city and contract type.
  • You sleep, it applies. Every application sent is listed in your account.
  • Free to start: up to 10 applications a month.
Start my automatic applicationsfor “Lead Planner”

Description du poste

Role overview

We are looking for an experienced Lead Planner to lead planning and scheduling across the Stegra Boden Project from within Central Project Controls. The role owns the integrated project schedule, sets planning standards for the project areas, and makes sure the schedules for Green Steel, Green Iron, Balance of Plant and the EPCM contractors fit together into one coherent plan.

The Lead Planner will provide a realistic view of the critical path, schedule performance and forecast completion, and will challenge schedules that are not achievable or not supported by sound logic.

Reporting line and team structure

These roles form an extension of Stegra’s Central Project Controls team, delivering into each of the project areas (Green Steel, Green Iron and Balance of Plant) while working to central standards, processes and governance.

Reports to the Head of Project Controls, Central Project Controls. Leads the planners in the central team and those deployed into the project areas.

Key responsibilities

  • Develop and maintain the integrated project schedule, bringing together engineering, procurement, construction, commissioning and start-up across all project areas.
  • Define and own the planning and scheduling procedures, standards, coding structures and schedule hierarchy used across the project.
  • Set the schedule requirements for EPCM contractors and review their submissions for logic, quality and alignment with contract milestones.
  • Establish and control the schedule baseline, incorporating approved changes through the central change process.
  • Carry out critical path and near-critical path analysis, and identify interface and float issues between project areas.
  • Lead schedule quality reviews using DCMA 14-point or equivalent assessments.
  • Prepare schedule impact assessments for change, delay and recovery options.
  • Support schedule risk analysis with the risk team, including probabilistic analysis.
  • Work with cost engineers on resource and cost loading, progress measurement and earned value.
  • Prepare schedule reports, look-ahead schedules and milestone tracking for project leadership.
  • Lead, mentor and develop the planning team.

Required experience and skills

  • Minimum 12 years’ planning and scheduling experience on major capital projects, including at least 5 years leading planning teams or an integrated project schedule.
  • Expert user of Primavera P6 (essential).
  • Proven experience integrating multiple EPCM and contractor schedules into a single project schedule.
  • Strong understanding of critical path analysis, schedule quality, delay analysis and earned value.
  • Experience with schedule risk analysis tools such as Safran Risk or Primavera Risk Analysis would be advantageous.
  • Experience planning the commissioning and start-up of process plant would be beneficial.
  • Experience in steel, metals, heavy industrial, energy or process plant projects would be beneficial.
  • Relevant degree in Engineering, Construction Management or a related discipline. AACE PSP or equivalent would be advantageous.

Key expectations