← Toutes les offres
E

Comparing AI R&D compute caps and deployment lags

elifland

Global
Publié le 24 novembre 2026

Description du poste

I’m publishing this a bit rougher than usual because it’s very pertinent to Evan Hubinger’s recent shortform, which advocates for blocking internal deployment as a pacing mechanism over compute reallocation (he mostly discusses it in the context of a risk-assessment-based regime, while this post discusses the policies standalone). (see my response to Evan which also summarizes this post.) I compare 2 classes of policies: • AI R&D compute cap: A cap on the percentage of compute used for capabilities R&D, as proposed at pacing-ai.com.• Deployment lags/freezes: An X-month lag means that you have to use models X months old for AI R&D (or, AIs at most as capable as the AIs you trained X months ago).[1] A freeze means you pick a capability level above which you can’t use models to do AI R&D. I sometimes separate out internal-only lags/freezes from internal+external (“uniform”) ones. If I just say lag, I mean it as shorthand for lag/freeze.Overall, I think compute caps are similarly good or slightly better than deployment lags/freezes (very possible I’ll change my mind in the future). Ignoring political feasibility, I think the best would be to combine both of them in order to get the immediate slowdown of the cap and the long-term + structural benefits of the lag/freeze.[2] I think it’s close enough that if one is significantly more feasible than the other, we should push for the more feasible one. I prefer internal deployment lags to external deployment lags because I think the societal awareness benefits are larger than the verification costs. Factor Cap vs. lag/freeze Reasoning Capability curve shape Compute cap (weak) Let’s consider lag 6 months vs. cap 10% implemented in Mar 2027, which result in similar TED-AI dates. Compute caps slow now->SAR more than lags, while lags slow SAR->TED-AI more. Here's a quick screenshot of an illustrative example comparing the 2 policies: Aggregating uplift-years, varying point of no return (PONR): The higher the capability level of